Crane Notification & Permissible Height Determination

Print
Press Enter to show all options, press Tab go to next option

Please correct the field(s) marked in red below:

MINIMUM 5 BUSINESS DAYS ADVANCE NOTICE REQUESTED
Requestor Name (Point of Contact)
Business Name
Requestor/Business Address
Phone
Email
Crane Company
Foreman Contact
Foreman Contact
Crane Operating Hours
Crane Operating Hours
Nighttime Operation Required?
 *
Nighttime Operation Required?
Date of Operation
Date of Operation
Boom Height Above Ground Level (AGL) in feet
Job Site Location
Job Site Location

GPS Coordinates of Crane: (Use NAD 83 Datum)(in Degrees, Minutes, Seconds)

 

GPS Coordinates of Crane: (Use NAD 83 Datum)(in Degrees, Minutes, Seconds)
Site Elevation (Above Mean Sea Level - AMSL)(in feet)

FAA - ASN

(if FAA 7460 study already completed)


CHECKLIST

  • If applicable, follow and abide by all conditions as set forth in FAA Aeronautical Study                  -OE
  • Coordinate with Airport and FAA Airport Traffic Control Tower before raising boom.
  • For daylight operations only, all cranes MUST be marked with an orange and white checkered flag.
  • For night/all-weather operation, cranes MUST be lighted with a red, omni-directional beacon.
  • All flagged cranes MUST be lowered at night and during inclement weather conditions.
  • FAA Form 7460-1 is available at https://oeaaa.faa.gov/

FOR FALCON FIELD AIRPORT USE ONLY

Date Received:
Reviewed By:
Distance to Airport Reference Point (ARP)

Does Applicant Need to File FAA Form 7460?

Yes                          No

 

FAA Notice of Proposed Construction (FAA Form 7460) Filed?

Yes                          No

 

 Maximum Boom Height Allowable
NOTAM Issued by Airport

  

COMMENTS


  1. To receive a copy of your submission, please fill out your email address below and submit.